Challenge
Adaptive re-use and natural challenges.
The transformation of an old warehouse into a modern structure was extensive; requiring demolition of the existing office spaces, exterior walls, loading docks, and about a third of the structure itself. Only portions of the steel frame and roof structure would remain, as almost all of the existing slabs were removed to allow for plumbing, electrical or new footing. Rock was found right at subgrade beneath the existing warehouses slab. The extent of rock would prove to be extensive and would require unorthodox means to meet the project schedule.


Solution
This solution was a blast!
More than a lineal mile of trenches would have to be blasted inside the building to make way for underground utilities. Utilizing a workforce of around 400 people daily, of all different trades, we divided the main building into 16 individual sequences. The use of technology, combined with an excellent team, allowed for all obstacles to be overcome.